<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>DHM Engineering</title>
	<atom:link href="https://www.melvineng.com/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.melvineng.com/</link>
	<description></description>
	<lastBuildDate>Mon, 12 Oct 2026 15:25:54 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.3</generator>

<image>
	<url>https://www.melvineng.com/wp-content/uploads/2020/07/cropped-favicon-1-32x32.png</url>
	<title>DHM Engineering</title>
	<link>https://www.melvineng.com/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>New Business Park Phase I Road and Utility</title>
		<link>https://www.melvineng.com/2026/10/09/new-business-park-phase-i-road-and-utility/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 09 Oct 2026 17:41:30 +0000</pubDate>
				<category><![CDATA[CEI]]></category>
		<category><![CDATA[Civil & Land Development]]></category>
		<category><![CDATA[Featured Projects]]></category>
		<category><![CDATA[Grants]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1839</guid>

					<description><![CDATA[<p>Project consisted of construction of 24’ wide asphalt paved roadway with curb and gutter, utilities, and drainage improvements. Water provided by extensions of the existing 10” county waterline, sewer provided by the existing county gravity sewer system. Stormwater provided by right-of-way conveyance to off-site drainage area, striping of restaurant area and SR 71. The DHM team provided: Roadway and infrastructure design, grant services, and construction engineering inspection for the newly created business park Collaboration: DHM worked seamlessly with Davidson Contracting, Inc., Jackson County Road Department, Jackson County Utilities Department, North Florida Asphalt, and Florida Public Utilities Challenges/Highlights: High traffic patterns</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/new-business-park-phase-i-road-and-utility/">New Business Park Phase I Road and Utility</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<div style="height:24px" aria-hidden="true" class="wp-block-spacer"></div>



<p class="wp-block-paragraph" class="intro-content">Project consisted of construction of 24’ wide asphalt paved roadway with curb and gutter, utilities, and drainage improvements. Water provided by extensions of the existing 10” county waterline, sewer provided by the existing county gravity sewer system. Stormwater provided by right-of-way conveyance to off-site drainage area, striping of restaurant area and SR 71.</p>



<p class="wp-block-paragraph"><strong>The DHM team provided:</strong> Roadway and infrastructure design, grant services, and construction engineering inspection for the newly created business park</p>



<p class="wp-block-paragraph"><strong>Collaboration:</strong> DHM worked seamlessly with Davidson Contracting, Inc., Jackson County Road Department, Jackson County Utilities Department, North Florida Asphalt, and Florida Public Utilities</p>



<p class="wp-block-paragraph"><strong>Challenges/Highlights:</strong> High traffic patterns I-10 and State Road 71, multi-agency coordination, accelerated timeline</p>



<p class="wp-block-paragraph"><strong>Size:</strong> 1-acre asphalt area, 20,677 SF building site</p>



<p class="wp-block-paragraph"><strong>Construction Cost:</strong> $801,792.66</p>



<p class="wp-block-paragraph"><strong>Project funded by:</strong> Florida Rural Infrastructure Fund</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/new-business-park-phase-i-road-and-utility/">New Business Park Phase I Road and Utility</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Graceville Fire Department</title>
		<link>https://www.melvineng.com/2026/10/09/graceville-fire-department/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 09 Oct 2026 17:38:41 +0000</pubDate>
				<category><![CDATA[CEI]]></category>
		<category><![CDATA[Civil & Land Development]]></category>
		<category><![CDATA[Featured Projects]]></category>
		<category><![CDATA[Grants]]></category>
		<category><![CDATA[Structural]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1834</guid>

					<description><![CDATA[<p>Project Scope consisted of construction of a 5,028 SF single story building and all associated site development work located on Prim Avenue, Graceville, Florida. The facility is designed to accommodate the Graceville Fire Department and features (3) vehicle bays, with doors, (1) restroom, (2) offices, a common area, meeting room, mechanical room, kitchen, bunker gear storage room, and laundry room. Site work included clearing and grubbing, earthwork, retention pond, reinforced concrete pavement, fencing and sodding. Underground utility construction was also included. The DHM team provided: Civil and Structural engineering design, Grant Administration, CEI, Construction Administration Collaboration: Donofro Architects, DHM Melvin</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/graceville-fire-department/">Graceville Fire Department</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">Project Scope consisted of construction of a 5,028 SF single story building and all associated site development work located on Prim Avenue, Graceville, Florida. The facility is designed to accommodate the Graceville Fire Department and features (3) vehicle bays, with doors, (1) restroom, (2) offices, a common area, meeting room, mechanical room, kitchen, bunker gear storage room, and laundry room.</p>



<p class="wp-block-paragraph">Site work included clearing and grubbing, earthwork, retention pond, reinforced concrete pavement, fencing and sodding. Underground utility construction was also included.</p>



<p class="wp-block-paragraph"><strong>The DHM team provided:</strong> Civil and Structural engineering design, Grant Administration, CEI, Construction Administration</p>



<p class="wp-block-paragraph"><strong>Collaboration:</strong> Donofro Architects, DHM Melvin Engineering, Reeves &amp; Shaw Construction, Watford Engineering</p>



<p class="wp-block-paragraph"><strong>Size:</strong> 5,028 SF Single Story building and site development</p>



<p class="wp-block-paragraph"><strong>Construction Budget:</strong> $2.2 Million</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/graceville-fire-department/">Graceville Fire Department</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>I-10 &#038; State Road 81 Infrastructure Improvements</title>
		<link>https://www.melvineng.com/2026/10/09/i-10-state-road-81-infrastructure-improvements/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 09 Oct 2026 17:35:31 +0000</pubDate>
				<category><![CDATA[CEI]]></category>
		<category><![CDATA[Civil & Land Development]]></category>
		<category><![CDATA[Featured Projects]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1830</guid>

					<description><![CDATA[<p>This project consisted of the construction of approximately 1,930 LF of asphalt roadway which will serve as new access for future business development. Drainage structures were also included consisting of concrete inlets, piping and concrete mitered end sections. Also included, the construction of stormwater ponds, fencing and pavement striping. Utility upgrades consisting of the construction of approximately 8,700 LF of 12” water main extension from the City water tower to Joe Manning Road were included. Sewer upgrades are included consisting of the construction of a new sewer lift station, 8” gravity sewer with concrete manholes and a 4” sewer force</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/i-10-state-road-81-infrastructure-improvements/">I-10 &amp; State Road 81 Infrastructure Improvements</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">This project consisted of the construction of approximately 1,930 LF of asphalt roadway which will serve as new access for future business development. Drainage structures were also included consisting of concrete inlets, piping and concrete mitered end sections. Also included, the construction of stormwater ponds, fencing and pavement striping. Utility upgrades consisting of the construction of approximately 8,700 LF of 12” water main extension from the City water tower to Joe Manning Road were included. Sewer upgrades are included consisting of the construction of a new sewer lift station, 8” gravity sewer with concrete manholes and a 4” sewer force main.</p>



<p class="wp-block-paragraph"><strong>The DHM team provided:</strong> DHM provided Design and permitting of 1,930 LF new truck access road, design and permitting of 8,700 SF of 12” water main extension. Design and permitting of new 8” gravity sanitary sewer system to facilitate current and future development along with a new municipal sewer lift station and a 9” sewer force main.</p>



<p class="wp-block-paragraph"><strong>Challenges and collaboration:</strong> Very tight design and construction schedule, various right-of-way easements and agreements, extensive permitting requirements with FDOT, FDEP, NWFWMD, and local governments</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/i-10-state-road-81-infrastructure-improvements/">I-10 &amp; State Road 81 Infrastructure Improvements</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Jackson County Schools &#124; Marianna K-8 School New Construction</title>
		<link>https://www.melvineng.com/2026/10/09/jackson-county-schools-marianna-k-8-school-new-construction/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 09 Oct 2026 16:52:07 +0000</pubDate>
				<category><![CDATA[Featured Projects]]></category>
		<category><![CDATA[Structural]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1823</guid>

					<description><![CDATA[<p>New Construction project scope consisted of approximately 385,000 SF. Structure consisted of masonry load bearing walls, special profile and standard steel bars, joists, cold formed steel walls and corridor framing. Cold formed steel roof trusses and pre-engineered metal buildings. Design included three middle school classroom buildings, one middle school gymnasium, four elementary school classroom buildings, one elementary school gymnasium, a shared cafetorium, and a combined administration building housing both administrative staff and the media center. The DHM team provided: DHM provided Structural design, landscape design, and threshold inspection of a new K-5 Elementary School and 6-8 Middle School Collaboration: DAG</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/jackson-county-schools-marianna-k-8-school-new-construction/">Jackson County Schools | Marianna K-8 School New Construction</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">New Construction project scope consisted of approximately 385,000 SF. Structure consisted of masonry load bearing walls, special profile and standard steel bars, joists, cold formed steel walls and corridor framing.</p>



<p class="wp-block-paragraph">Cold formed steel roof trusses and pre-engineered metal buildings. Design included three middle school classroom buildings, one middle school gymnasium, four elementary school classroom buildings, one elementary school gymnasium, a shared cafetorium, and a combined administration building housing both administrative staff and the media center.</p>



<p class="wp-block-paragraph"><strong>The DHM team provided:</strong> DHM provided Structural design, landscape design, and threshold inspection of a new K-5 Elementary School and 6-8 Middle School</p>



<p class="wp-block-paragraph"><strong>Collaboration:</strong> DAG Architects, Donofro Architects, DHM Melvin Engineering, Culpepper Construction</p>



<p class="wp-block-paragraph"><strong>Construction Cost:</strong> $52 Million</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/jackson-county-schools-marianna-k-8-school-new-construction/">Jackson County Schools | Marianna K-8 School New Construction</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Sarah Sun</title>
		<link>https://www.melvineng.com/2026/08/31/sarah-sun/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 31 Aug 2026 17:19:02 +0000</pubDate>
				<category><![CDATA[Executive]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1790</guid>

					<description><![CDATA[<p>Finance Leader</p>
<p>The post <a href="https://www.melvineng.com/2026/08/31/sarah-sun/">Sarah Sun</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">Finance Leader</p>
<p>The post <a href="https://www.melvineng.com/2026/08/31/sarah-sun/">Sarah Sun</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Genna P. Strickland</title>
		<link>https://www.melvineng.com/2026/08/31/genna-p-strickland/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 31 Aug 2026 17:16:16 +0000</pubDate>
				<category><![CDATA[Staff Bio]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1786</guid>

					<description><![CDATA[<p>Project Engineer &#124; Transportation</p>
<p>The post <a href="https://www.melvineng.com/2026/08/31/genna-p-strickland/">Genna P. Strickland</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">Project Engineer | Transportation</p>
<p>The post <a href="https://www.melvineng.com/2026/08/31/genna-p-strickland/">Genna P. Strickland</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Wilanne Daniels</title>
		<link>https://www.melvineng.com/2026/08/10/wilanne-daniels/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 10 Aug 2026 14:43:33 +0000</pubDate>
				<category><![CDATA[Executive]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1776</guid>

					<description><![CDATA[<p>Integrator/Marketing Director</p>
<p>The post <a href="https://www.melvineng.com/2026/08/10/wilanne-daniels/">Wilanne Daniels</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">Integrator/Marketing Director</p>
<p>The post <a href="https://www.melvineng.com/2026/08/10/wilanne-daniels/">Wilanne Daniels</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Chrome Ministries</title>
		<link>https://www.melvineng.com/2026/07/06/chrome-ministries/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 06 Jul 2026 20:29:20 +0000</pubDate>
				<category><![CDATA[Community Partners]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1745</guid>

					<description><![CDATA[<p>The post <a href="https://www.melvineng.com/2026/07/06/chrome-ministries/">Chrome Ministries</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The post <a href="https://www.melvineng.com/2026/07/06/chrome-ministries/">Chrome Ministries</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Next Step at Endeavor</title>
		<link>https://www.melvineng.com/2026/07/06/next-step-at-endeavor/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 06 Jul 2026 20:24:54 +0000</pubDate>
				<category><![CDATA[Community Partners]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1740</guid>

					<description><![CDATA[<p>The post <a href="https://www.melvineng.com/2026/07/06/next-step-at-endeavor/">Next Step at Endeavor</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>The post <a href="https://www.melvineng.com/2026/07/06/next-step-at-endeavor/">Next Step at Endeavor</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Brett Davis</title>
		<link>https://www.melvineng.com/2026/02/19/brett-davis/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Thu, 19 Feb 2026 22:00:16 +0000</pubDate>
				<category><![CDATA[Staff Bio]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1687</guid>

					<description><![CDATA[<p>Project Manager I CEI</p>
<p>The post <a href="https://www.melvineng.com/2026/02/19/brett-davis/">Brett Davis</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">Project Manager  I  CEI</p>



<p class="wp-block-paragraph"></p>
<p>The post <a href="https://www.melvineng.com/2026/02/19/brett-davis/">Brett Davis</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
