I-10 & State Road 81 Infrastructure Improvements

This project consisted of the construction of approximately 1,930 LF of asphalt roadway which will serve as new access for future business development. Drainage structures were also included consisting of concrete inlets, piping and concrete mitered end sections. Also included, the construction of stormwater ponds, fencing and pavement striping. Utility upgrades consisting of the construction of approximately 8,700 LF of 12” water main extension from the City water tower to Joe Manning Road were included. Sewer upgrades are included consisting of the construction of a new sewer lift station, 8” gravity sewer with concrete manholes and a 4” sewer force main.

The DHM team provided: DHM provided Design and permitting of 1,930 LF new truck access road, design and permitting of 8,700 SF of 12” water main extension. Design and permitting of new 8” gravity sanitary sewer system to facilitate current and future development along with a new municipal sewer lift station and a 9” sewer force main.

Challenges and collaboration: Very tight design and construction schedule, various right-of-way easements and agreements, extensive permitting requirements with FDOT, FDEP, NWFWMD, and local governments