<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>CEI Archives - DHM Engineering</title>
	<atom:link href="https://www.melvineng.com/category/cei/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.melvineng.com/category/cei/</link>
	<description></description>
	<lastBuildDate>Fri, 09 Oct 2026 17:48:00 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.3</generator>

<image>
	<url>https://www.melvineng.com/wp-content/uploads/2020/07/cropped-favicon-1-32x32.png</url>
	<title>CEI Archives - DHM Engineering</title>
	<link>https://www.melvineng.com/category/cei/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>New Business Park Phase I Road and Utility</title>
		<link>https://www.melvineng.com/2026/10/09/new-business-park-phase-i-road-and-utility/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 09 Oct 2026 17:41:30 +0000</pubDate>
				<category><![CDATA[CEI]]></category>
		<category><![CDATA[Civil & Land Development]]></category>
		<category><![CDATA[Featured Projects]]></category>
		<category><![CDATA[Grants]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1839</guid>

					<description><![CDATA[<p>Project consisted of construction of 24’ wide asphalt paved roadway with curb and gutter, utilities, and drainage improvements. Water provided by extensions of the existing 10” county waterline, sewer provided by the existing county gravity sewer system. Stormwater provided by right-of-way conveyance to off-site drainage area, striping of restaurant area and SR 71. The DHM team provided: Roadway and infrastructure design, grant services, and construction engineering inspection for the newly created business park Collaboration: DHM worked seamlessly with Davidson Contracting, Inc., Jackson County Road Department, Jackson County Utilities Department, North Florida Asphalt, and Florida Public Utilities Challenges/Highlights: High traffic patterns</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/new-business-park-phase-i-road-and-utility/">New Business Park Phase I Road and Utility</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<div style="height:24px" aria-hidden="true" class="wp-block-spacer"></div>



<p class="wp-block-paragraph" class="intro-content">Project consisted of construction of 24’ wide asphalt paved roadway with curb and gutter, utilities, and drainage improvements. Water provided by extensions of the existing 10” county waterline, sewer provided by the existing county gravity sewer system. Stormwater provided by right-of-way conveyance to off-site drainage area, striping of restaurant area and SR 71.</p>



<p class="wp-block-paragraph"><strong>The DHM team provided:</strong> Roadway and infrastructure design, grant services, and construction engineering inspection for the newly created business park</p>



<p class="wp-block-paragraph"><strong>Collaboration:</strong> DHM worked seamlessly with Davidson Contracting, Inc., Jackson County Road Department, Jackson County Utilities Department, North Florida Asphalt, and Florida Public Utilities</p>



<p class="wp-block-paragraph"><strong>Challenges/Highlights:</strong> High traffic patterns I-10 and State Road 71, multi-agency coordination, accelerated timeline</p>



<p class="wp-block-paragraph"><strong>Size:</strong> 1-acre asphalt area, 20,677 SF building site</p>



<p class="wp-block-paragraph"><strong>Construction Cost:</strong> $801,792.66</p>



<p class="wp-block-paragraph"><strong>Project funded by:</strong> Florida Rural Infrastructure Fund</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/new-business-park-phase-i-road-and-utility/">New Business Park Phase I Road and Utility</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Graceville Fire Department</title>
		<link>https://www.melvineng.com/2026/10/09/graceville-fire-department/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 09 Oct 2026 17:38:41 +0000</pubDate>
				<category><![CDATA[CEI]]></category>
		<category><![CDATA[Civil & Land Development]]></category>
		<category><![CDATA[Featured Projects]]></category>
		<category><![CDATA[Grants]]></category>
		<category><![CDATA[Structural]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1834</guid>

					<description><![CDATA[<p>Project Scope consisted of construction of a 5,028 SF single story building and all associated site development work located on Prim Avenue, Graceville, Florida. The facility is designed to accommodate the Graceville Fire Department and features (3) vehicle bays, with doors, (1) restroom, (2) offices, a common area, meeting room, mechanical room, kitchen, bunker gear storage room, and laundry room. Site work included clearing and grubbing, earthwork, retention pond, reinforced concrete pavement, fencing and sodding. Underground utility construction was also included. The DHM team provided: Civil and Structural engineering design, Grant Administration, CEI, Construction Administration Collaboration: Donofro Architects, DHM Melvin</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/graceville-fire-department/">Graceville Fire Department</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">Project Scope consisted of construction of a 5,028 SF single story building and all associated site development work located on Prim Avenue, Graceville, Florida. The facility is designed to accommodate the Graceville Fire Department and features (3) vehicle bays, with doors, (1) restroom, (2) offices, a common area, meeting room, mechanical room, kitchen, bunker gear storage room, and laundry room.</p>



<p class="wp-block-paragraph">Site work included clearing and grubbing, earthwork, retention pond, reinforced concrete pavement, fencing and sodding. Underground utility construction was also included.</p>



<p class="wp-block-paragraph"><strong>The DHM team provided:</strong> Civil and Structural engineering design, Grant Administration, CEI, Construction Administration</p>



<p class="wp-block-paragraph"><strong>Collaboration:</strong> Donofro Architects, DHM Melvin Engineering, Reeves &amp; Shaw Construction, Watford Engineering</p>



<p class="wp-block-paragraph"><strong>Size:</strong> 5,028 SF Single Story building and site development</p>



<p class="wp-block-paragraph"><strong>Construction Budget:</strong> $2.2 Million</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/graceville-fire-department/">Graceville Fire Department</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>I-10 &#038; State Road 81 Infrastructure Improvements</title>
		<link>https://www.melvineng.com/2026/10/09/i-10-state-road-81-infrastructure-improvements/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 09 Oct 2026 17:35:31 +0000</pubDate>
				<category><![CDATA[CEI]]></category>
		<category><![CDATA[Civil & Land Development]]></category>
		<category><![CDATA[Featured Projects]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=1830</guid>

					<description><![CDATA[<p>This project consisted of the construction of approximately 1,930 LF of asphalt roadway which will serve as new access for future business development. Drainage structures were also included consisting of concrete inlets, piping and concrete mitered end sections. Also included, the construction of stormwater ponds, fencing and pavement striping. Utility upgrades consisting of the construction of approximately 8,700 LF of 12” water main extension from the City water tower to Joe Manning Road were included. Sewer upgrades are included consisting of the construction of a new sewer lift station, 8” gravity sewer with concrete manholes and a 4” sewer force</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/i-10-state-road-81-infrastructure-improvements/">I-10 &amp; State Road 81 Infrastructure Improvements</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">This project consisted of the construction of approximately 1,930 LF of asphalt roadway which will serve as new access for future business development. Drainage structures were also included consisting of concrete inlets, piping and concrete mitered end sections. Also included, the construction of stormwater ponds, fencing and pavement striping. Utility upgrades consisting of the construction of approximately 8,700 LF of 12” water main extension from the City water tower to Joe Manning Road were included. Sewer upgrades are included consisting of the construction of a new sewer lift station, 8” gravity sewer with concrete manholes and a 4” sewer force main.</p>



<p class="wp-block-paragraph"><strong>The DHM team provided:</strong> DHM provided Design and permitting of 1,930 LF new truck access road, design and permitting of 8,700 SF of 12” water main extension. Design and permitting of new 8” gravity sanitary sewer system to facilitate current and future development along with a new municipal sewer lift station and a 9” sewer force main.</p>



<p class="wp-block-paragraph"><strong>Challenges and collaboration:</strong> Very tight design and construction schedule, various right-of-way easements and agreements, extensive permitting requirements with FDOT, FDEP, NWFWMD, and local governments</p>
<p>The post <a href="https://www.melvineng.com/2026/10/09/i-10-state-road-81-infrastructure-improvements/">I-10 &amp; State Road 81 Infrastructure Improvements</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>County Road 392, Roadway Resurfacing and Reconstruction</title>
		<link>https://www.melvineng.com/2019/10/21/county-road-392-roadway-resurfacing-and-reconstruction/</link>
					<comments>https://www.melvineng.com/2019/10/21/county-road-392-roadway-resurfacing-and-reconstruction/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 21 Oct 2019 20:31:05 +0000</pubDate>
				<category><![CDATA[CEI]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=661</guid>

					<description><![CDATA[<p>County Road 392 project consisted of roadway resurfacing with areas of roadway reconstruction, drainage improvements and guardrail installation</p>
<p>The post <a href="https://www.melvineng.com/2019/10/21/county-road-392-roadway-resurfacing-and-reconstruction/">County Road 392, Roadway Resurfacing and Reconstruction</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">County Road 392 project consisted of roadway resurfacing with areas of roadway reconstruction, drainage improvements and guardrail installation</p>
<p>The post <a href="https://www.melvineng.com/2019/10/21/county-road-392-roadway-resurfacing-and-reconstruction/">County Road 392, Roadway Resurfacing and Reconstruction</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.melvineng.com/2019/10/21/county-road-392-roadway-resurfacing-and-reconstruction/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Usery Road Sidewalk LAP Project</title>
		<link>https://www.melvineng.com/2019/10/21/usery-road-sidewalk-lap-project/</link>
					<comments>https://www.melvineng.com/2019/10/21/usery-road-sidewalk-lap-project/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 21 Oct 2019 20:30:33 +0000</pubDate>
				<category><![CDATA[CEI]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=658</guid>

					<description><![CDATA[<p>The Usery Road LAP Sidewalk Project consisted of 5&#8242; sidewalk construction, drainage improvements, and pedestrian facility upgrades.</p>
<p>The post <a href="https://www.melvineng.com/2019/10/21/usery-road-sidewalk-lap-project/">Usery Road Sidewalk LAP Project</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">The Usery Road LAP Sidewalk Project consisted of 5&#8242; sidewalk construction, drainage improvements, and pedestrian facility upgrades.</p>
<p>The post <a href="https://www.melvineng.com/2019/10/21/usery-road-sidewalk-lap-project/">Usery Road Sidewalk LAP Project</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.melvineng.com/2019/10/21/usery-road-sidewalk-lap-project/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>County Road 164B (Hummingbird Road) FDOT SCRAP project</title>
		<link>https://www.melvineng.com/2019/10/21/county-road-164b-hummingbird-road-fdot-scrap-project/</link>
					<comments>https://www.melvineng.com/2019/10/21/county-road-164b-hummingbird-road-fdot-scrap-project/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 21 Oct 2019 20:30:05 +0000</pubDate>
				<category><![CDATA[CEI]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=655</guid>

					<description><![CDATA[<p>County Road 164B (Hummingbird Road) project consisted of full depth reclamation of the existing roadway, drainage improvements and resurfacing of Hummingbird Road from State Road 71 to County Road 165 (Basswood Road). The project was to reconstruct and widen Hummingbird Road and was approximately 2.94 miles.</p>
<p>The post <a href="https://www.melvineng.com/2019/10/21/county-road-164b-hummingbird-road-fdot-scrap-project/">County Road 164B (Hummingbird Road) FDOT SCRAP project</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">County Road 164B (Hummingbird Road) project consisted of full depth reclamation of the existing roadway, drainage improvements and resurfacing of Hummingbird Road from State Road 71 to County Road 165 (Basswood Road). The project was to reconstruct and widen Hummingbird Road and was approximately 2.94 miles.  </p>
<p>The post <a href="https://www.melvineng.com/2019/10/21/county-road-164b-hummingbird-road-fdot-scrap-project/">County Road 164B (Hummingbird Road) FDOT SCRAP project</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.melvineng.com/2019/10/21/county-road-164b-hummingbird-road-fdot-scrap-project/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>Little Sycamore Road SCRAP Project</title>
		<link>https://www.melvineng.com/2019/10/21/little-sycamore-road-scrap-project/</link>
					<comments>https://www.melvineng.com/2019/10/21/little-sycamore-road-scrap-project/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 21 Oct 2019 20:29:34 +0000</pubDate>
				<category><![CDATA[CEI]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=652</guid>

					<description><![CDATA[<p>Resurfacing guardrail installation and drainage improvements of Little Sycamore Road in Gadsden County. The scope of work included widening and resurfacing 4.21 miles of Little Sycamore Road in Gadsden County, from Sycamore Road to Flat Creek Road.</p>
<p>The post <a href="https://www.melvineng.com/2019/10/21/little-sycamore-road-scrap-project/">Little Sycamore Road SCRAP Project</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">Resurfacing guardrail installation and drainage improvements of Little Sycamore Road in Gadsden County. The scope of work included widening and resurfacing 4.21 miles of Little Sycamore Road in Gadsden County, from Sycamore Road to Flat Creek Road.  </p>
<p>The post <a href="https://www.melvineng.com/2019/10/21/little-sycamore-road-scrap-project/">Little Sycamore Road SCRAP Project</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.melvineng.com/2019/10/21/little-sycamore-road-scrap-project/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
		<item>
		<title>State Road 81 Milling and Resurfacing with Drainage Improvements and Guardrail</title>
		<link>https://www.melvineng.com/2019/10/11/state-road-81-milling-and-resurfacing-with-drainage-improvements-and-guardrail/</link>
					<comments>https://www.melvineng.com/2019/10/11/state-road-81-milling-and-resurfacing-with-drainage-improvements-and-guardrail/#respond</comments>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Fri, 11 Oct 2019 19:20:12 +0000</pubDate>
				<category><![CDATA[CEI]]></category>
		<guid isPermaLink="false">https://www.melvineng.com/?p=445</guid>

					<description><![CDATA[<p>This FDOT State Road 81 project was a 21.5-mile project which consisted of milling and resurfacing, drainage improvements, guardrail replacement and turn lane construction on State Road 81 from the Walton County Line to the State of Alabama.</p>
<p>The post <a href="https://www.melvineng.com/2019/10/11/state-road-81-milling-and-resurfacing-with-drainage-improvements-and-guardrail/">State Road 81 Milling and Resurfacing with Drainage Improvements and Guardrail</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></description>
										<content:encoded><![CDATA[
<p class="wp-block-paragraph" class="intro-content">This FDOT State Road 81 project was a 21.5-mile project which consisted of milling and resurfacing, drainage improvements, guardrail replacement and turn lane construction on State Road 81 from the Walton County Line to the State of Alabama.</p>
<p>The post <a href="https://www.melvineng.com/2019/10/11/state-road-81-milling-and-resurfacing-with-drainage-improvements-and-guardrail/">State Road 81 Milling and Resurfacing with Drainage Improvements and Guardrail</a> appeared first on <a href="https://www.melvineng.com">DHM Engineering</a>.</p>
]]></content:encoded>
					
					<wfw:commentRss>https://www.melvineng.com/2019/10/11/state-road-81-milling-and-resurfacing-with-drainage-improvements-and-guardrail/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
			</item>
	</channel>
</rss>
