Florida Senate Chamber Renovations and Dome Replacement

As subconsultants to Hicks Nation Architects, the DHM team provided structural engineering and special inspections. Tasks included analysis of existing structure for construction loads, structural engineering design on miscellaneous framing of soffits, partitions, catwalks, stained glass seal support, and stage area.

Safety Considerations: Our DHM senior structural design engineer was the authorized representative that completed threshold inspections. These were conducted to ensure the work was performed in accordance with design documents.

Construction Cost: $4.6 Million