State Road 79 Design / Build / Finance Multilane Reconstruction Project

Anderson Columbia Company, Inc. (ACCI) teamed with DHM, Florida Bridge and Transportation (FBT), and Snelgrove Surveying and Mapping (SSM) to design and construct this two-lane to four-lane reconstruction project along the State Road 79 Corridor from Mill Branch Bridge to I-10 (21-mile long project).

As part of the Anderson Columbia Company, Inc. (ACCI) Design / Build / Finance team, DHM provided roadway, signalization, signing and paving markings, drainage, and permitting.

Notable: This ACCI project is the largest Design / Build / Finance roadway project in the Florida Department of Transportation District 3. This project includes extensive wetland impacts and permitting, construction of 37 stormwater management facilities, utility relocation and coordination, complete utility system design and rebuild in the City of Vernon, complex geotechnical investigation, including specialty construction techniques using rigid inclusions, wick drains and surcharge.

The project also includes the construction of three bridges.

Construction cost: $104 Million