New Business Park Phase I Road and Utility

Project consisted of construction of 24’ wide asphalt paved roadway with curb and gutter, utilities, and drainage improvements. Water provided by extensions of the existing 10” county waterline, sewer provided by the existing county gravity sewer system. Stormwater provided by right-of-way conveyance to off-site drainage area, striping of restaurant area and SR 71.

The DHM team provided: Roadway and infrastructure design, grant services, and construction engineering inspection for the newly created business park

Collaboration: DHM worked seamlessly with Davidson Contracting, Inc., Jackson County Road Department, Jackson County Utilities Department, North Florida Asphalt, and Florida Public Utilities

Challenges/Highlights: High traffic patterns I-10 and State Road 71, multi-agency coordination, accelerated timeline

Size: 1-acre asphalt area, 20,677 SF building site

Construction Cost: $801,792.66

Project funded by: Florida Rural Infrastructure Fund