News

New Business Park Phase I Road and Utility

Project consisted of construction of 24’ wide asphalt paved roadway with curb and gutter, utilities, and drainage improvements. Water provided by extensions of the existing 10” county waterline, sewer provided by the existing county gravity sewer system. Stormwater provided by right-of-way conveyance to off-site drainage area, striping of restaurant area and SR 71. The DHM team provided: Roadway and infrastructure design, grant services, and construction engineering inspection for the newly created business park Collaboration: DHM worked seamlessly with Davidson Contracting, Inc., Jackson County Road Department, Jackson County Utilities Department, North Florida Asphalt, and Florida Public Utilities Challenges/Highlights: High traffic patterns

Graceville Fire Department

Project Scope consisted of construction of a 5,028 SF single story building and all associated site development work located on Prim Avenue, Graceville, Florida. The facility is designed to accommodate the Graceville Fire Department and features (3) vehicle bays, with doors, (1) restroom, (2) offices, a common area, meeting room, mechanical room, kitchen, bunker gear storage room, and laundry room. Site work included clearing and grubbing, earthwork, retention pond, reinforced concrete pavement, fencing and sodding. Underground utility construction was also included. The DHM team provided: Civil and Structural engineering design, Grant Administration, CEI, Construction Administration Collaboration: Donofro Architects, DHM Melvin

Sneads Wastewater Treatment Plant and Sprayfield Extension – Phase I and II

Upgrade the existing facilities included increased capacity from 495,000 gallons per day (gpd) to 1.1 million gbd. The effluent sprayfield was expanded from 40 acres to 203 acres. Accomplished in multiple phases over several years with funding from USDA Rural Development and the Florida Department of Environmental Protection, and the State of Florida community Development Block Grant program, the facility underwent another upgrade to significantly increase capacity. Notable: This multi-phase state-of-the-art facility gained statewide recognition from USDA – Rural Development. Selected from projects located throughout the State of Florida, the Sneads facility was selected as the top award winner based

Blountstown Greenway Multi-Use Trail

Located in the Northwest quadrant of the City of Blountstown, and winding through the City for approximately 5 miles, the greenway trail spans from the Apalachicola River at Neal Landing on the southeast to Sam Atkins Park on the northwest. Portions of the trail follow the former Marianna and Blountstown Railroad which served the area from 1909 until 1972. Midway on the trail visitors can enjoy a stop at local shops and additional areas of interest. DHM provided Grants Administration, Planning and Development, Environmental Assessments, Right-of-Way Acquisition coordination with the FDOT, and Construction Inspection. Those using the trail today find

Marianna Airport Commerce Park

Improve infrastructure at the Marianna Airport Commerce Park, specifically to site for a manufacturer recruited to the area. The Scope of Services included increasing water/wastewater capacity for expansion and future growth, demolition of two existing water storage facilities, determining location of existing water/wastewater lines and other utilities (telecommunications and natural gas) to extend services, identifying fire protection needs, roadway and parking area improvements, and Landscape and irrigation design. Notable: The Largest Communities Development Block Grant – Economic Development Grant Award Ever Funded by the State of Florida – $3.2 million dollars for infrastructure improvements DHM provided FULL GRANT ADMINISTRATION SERVICES