The project consisted of an 8,400 SF commercial shopping center located on Hwy 90 East in Marianna, Florida. Melvin Engineering was responsible for all site design, drainage design, permitting and construction inspection. DHM Highlights: Complete site design, expedited design schedule, project management, drainage design, utility design and permitting and construction inspection. Project Tasks: Environmental Permitting Topographic and Boundary Survey New driveway on Hwy 90 Notable: Expedited design schedule, collaborative effort with adjacent land owners regarding stormwater capacity within adjacent regional stormwater facilities.
News
Eastside Plaza Development – Marianna, Florida
Dairy Queen Grill and Chill – Jackson County/Marianna, Florida
The project consisted of the construction of a 2,100 SF Dairy Queen Grill and Chill restaurant located on the SR 71 south of the I-10 interchange in Jackson County, Florida. Melvin Engineering was responsible for all site design, drainage design, utility design, permitting and construction inspection. DHM Highlights: Complete site design, extension of natural gas, expedited design schedule, project management, utility design and permitting and construction inspection. Project Tasks: 1.29-mile natural gas extension and utility permitting Environmental Permitting Topographic and Boundary Survey New driveway on SR 71 Regional stormwater facility Notable: Expedited design schedule, collaborative effort with the City of
Distribution Park – Jackson County I Marianna, Florida
The project consisted of the construction of the site design for a 351-acre Distribution Park located adjacent to I-10 in Marianna, Florida. Melvin Engineering was responsible for all site design, utilities, permitting and construction inspection. DHM Highlights: Complete Site Distribution Park Design, Extension of Water, Sewer and Natural Gas Expedited Construction Schedule, Project Management, Utility Design and Permitting, and Construction Engineering Inspection Project Tasks: Directional Bore Under Interstate 10 for Distance of 980’ for Natural Gas, Water, and Wastewater Multiple Wastewater Pumping Stations Environmental Permitting Land Use Change from Ag to Commercial Park Topographic and Boundary Surveys 300,000 Gallon Pedosphere