Project consisted of construction of 24’ wide asphalt paved roadway with curb and gutter, utilities, and drainage improvements. Water provided by extensions of the existing 10” county waterline, sewer provided by the existing county gravity sewer system. Stormwater provided by right-of-way conveyance to off-site drainage area, striping of restaurant area and SR 71. The DHM team provided: Roadway and infrastructure design, grant services, and construction engineering inspection for the newly created business park Collaboration: DHM worked seamlessly with Davidson Contracting, Inc., Jackson County Road Department, Jackson County Utilities Department, North Florida Asphalt, and Florida Public Utilities Challenges/Highlights: High traffic patterns
News
New Business Park Phase I Road and Utility
Graceville Fire Department
Project Scope consisted of construction of a 5,028 SF single story building and all associated site development work located on Prim Avenue, Graceville, Florida. The facility is designed to accommodate the Graceville Fire Department and features (3) vehicle bays, with doors, (1) restroom, (2) offices, a common area, meeting room, mechanical room, kitchen, bunker gear storage room, and laundry room. Site work included clearing and grubbing, earthwork, retention pond, reinforced concrete pavement, fencing and sodding. Underground utility construction was also included. The DHM team provided: Civil and Structural engineering design, Grant Administration, CEI, Construction Administration Collaboration: Donofro Architects, DHM Melvin
I-10 & State Road 81 Infrastructure Improvements
This project consisted of the construction of approximately 1,930 LF of asphalt roadway which will serve as new access for future business development. Drainage structures were also included consisting of concrete inlets, piping and concrete mitered end sections. Also included, the construction of stormwater ponds, fencing and pavement striping. Utility upgrades consisting of the construction of approximately 8,700 LF of 12” water main extension from the City water tower to Joe Manning Road were included. Sewer upgrades are included consisting of the construction of a new sewer lift station, 8” gravity sewer with concrete manholes and a 4” sewer force
County Road 392, Roadway Resurfacing and Reconstruction
County Road 392 project consisted of roadway resurfacing with areas of roadway reconstruction, drainage improvements and guardrail installation
Usery Road Sidewalk LAP Project
The Usery Road LAP Sidewalk Project consisted of 5′ sidewalk construction, drainage improvements, and pedestrian facility upgrades.
County Road 164B (Hummingbird Road) FDOT SCRAP project
County Road 164B (Hummingbird Road) project consisted of full depth reclamation of the existing roadway, drainage improvements and resurfacing of Hummingbird Road from State Road 71 to County Road 165 (Basswood Road). The project was to reconstruct and widen Hummingbird Road and was approximately 2.94 miles.
Little Sycamore Road SCRAP Project
Resurfacing guardrail installation and drainage improvements of Little Sycamore Road in Gadsden County. The scope of work included widening and resurfacing 4.21 miles of Little Sycamore Road in Gadsden County, from Sycamore Road to Flat Creek Road.
State Road 81 Milling and Resurfacing with Drainage Improvements and Guardrail
This FDOT State Road 81 project was a 21.5-mile project which consisted of milling and resurfacing, drainage improvements, guardrail replacement and turn lane construction on State Road 81 from the Walton County Line to the State of Alabama.